Application - Solar Guard

SURFACE PREP

  • Power wash surfaces and remove any stains.

 

APPLICATION

  • Shake well before application.
  • Apply using Tornador & portable air compressor or HVLP sprayer.
  • Air Compressor Pressure: 4.5-6.3 bars. 
  • Spray Gun Distance: 1.9-4in from the surface. 
  • 2 coats recommended, applied in a cross pattern. 
  • Application Time: ~2 min per 1.75 sq. ft. of PV panel surface
  • No dilution is required. Do not over-apply.
  • Test a small area before full-scale application.

 

ESTIMATED CONSUMPTION

  • Up to 1400 sq.ft. per gallon, dependent on application method.

 

APPLICATION VIDEO